DURING THE REMODEL

Strip existing structure to studs. Add new square footage for Master Bedroom Suite and ADU.

Install new plumbing, electrical, and mechanical systems. Reinforce foundation footings throughout.

Enlarged front porch.  Vaulted ceilings.

Build out 2 new kitchens, 4 new bathrooms, the new Master Suite, the Great Room with vaulted ceilings, secondary bedrooms, and laundry space.

Prepping the exterior for stucco.  Roof receiving waterproofing membrane.

Insulation in the great room.

Stucco going on mid-April.

Stucco and fascia on the ADU.

Fireplace and drywall in the great room, laundry room on the left.